What it does. Walks the tech through the 7-step 2026 A2L mini-split quote workflow and produces a printable compliance summary documenting the reasoning for the AHJ inspector.
A2L 2026 Quote Workflow Wizard
Detailed Overview
The A2L 2026 Quote Workflow Wizard turns the seven-step quote process from the HKIA A2L Mitigation series into a guided digital workflow. The output is a print-ready compliance summary the tech can attach to the customer proposal and hand to the AHJ inspector.
The Seven Steps
- Rooms. Measure every zone. Smallest room sets the constraint.
- Equipment. Pull manufacturer specs. Verify factory charge, refrigerant, additional charge per foot of lineset.
- Compliance. Per-room PASS/FAIL math against ASHRAE 15 RCL limits.
- Ducted Option. Evaluate the central air handler + zoning alternative.
- Free Design. Request manufacturer engineering (Airzone, Daikin, Mitsubishi, Carrier all design for free with the right inputs).
- Quote Options. Build the three-option structured comparison the homeowner will see.
- Document. Produce the printable compliance summary.
When and Where to Use It
- During the site visit. Walk the rooms, enter dimensions, capture the homeowner’s input on duct path feasibility, request manufacturer design over the phone, all in the same session.
- Quote preparation. Generate the documented compliance summary as an attachment to the proposal.
- Inspector / AHJ submission. AHJs adopting ASHRAE 15-2022 and UL 60335-2-40 are starting to ask for documented compliance reasoning. The Step 7 summary is that document.
- Internal training. New estimators can follow the Wizard’s structure to learn the workflow without missing a step.
- Sales conversation. Walk the homeowner through the steps live so they understand why three options are being quoted and which is the default-compliant choice.
Output Document
The Step 7 printable summary includes:
- Job header. Customer name, address, prepared-by line, generation date.
- Proposed equipment. Outdoor unit model, refrigerant, RCL value, releasable charge, shut-off valve kit status.
- Per-room dispersal volume table. Room name, volume (ft³), RCL limit (lb), PASS/FAIL status.
- Three-option comparison table. Multi-zone wall-mount / Central ducted with zoning / Single-zone 1-to-1, each with compliance status and contractor notes.
- References footer. ASHRAE 15-2022, ASHRAE 34-2022, UL 60335-2-40, AHRI A2L Building Code Map, EPA Final Rule SAN-12166.
Limitations
- The Wizard does not retain state across sessions. Each session starts fresh. To preserve a quote, use the Step 7 print or copy-to-clipboard outputs.
- The output summary is documented compliance reasoning, not a substitute for actual code review. AHJs may require additional documentation depending on the jurisdiction.
- The Wizard assumes residential A2L mini-split applications. Commercial and VRF applications have additional requirements not covered.
Sources
- ASHRAE Standard 15-2022, § 7.3.4.2 (releasable refrigerant charge).
- ASHRAE Standard 34-2022 Addendum a (RCL values).
- UL 60335-2-40, 4th Edition (Annexes GG and LL).
- EPA Final Rule SAN-12166 (May 21, 2026).
- AHRI A2L Building Code Map.
- Daikin IO-7032B, ZONEFIRST, Resideo, Arzel, Ecojay technical documentation for A2L-compatible zoning hardware.
